Vessels & fabrication · Free tool
Steel weight calculator
Work out the weight of plates, pipes, rolled shells, bars and rings in carbon steel, stainless steel, duplex, titanium, Hastelloy and more, with an optional cost estimate.
1. Material
2. Shape and size
3. Cost
Optional, to estimate material cost
Total weight
150kg
0.15 t
Weight each
150kg
Material cost
–
Enter a rate
| Density used | 8000 kg/m³ |
|---|---|
| Volume (each) | 18.75 litres |
| Surface area (outside / face, each) | 3.125 m² |
Want these numbers checked?
Send them to a SEMCO process engineer for a free review, sizing and budget price.
How this calculator works
The calculator finds the metal volume from the shape's dimensions and multiplies it by the material density. For shells it uses the inside diameter plus twice the thickness as the outside diameter.
Formulas used
Plate
Pipe or shell
Assumptions and limits
- Nominal dimensions; mill tolerances and weld metal are not included.
- Densities: carbon steel 7,850, stainless 8,000, duplex 7,800, titanium 4,510, Hastelloy C-276 8,890 kg/m³.
Worked example
A stainless steel plate 2,500 × 1,250 × 6 mm.
- Volume = 2.5 × 1.25 × 0.006 = 0.01875 m³.
- Weight = 0.01875 × 8,000 = 150 kg.
Frequently asked questions
What is the density of stainless steel?
About 7,900–8,000 kg/m³ for 304 and 316; this calculator uses 8,000.
How do I calculate pipe weight per metre?
Weight per metre = π/4 × (OD² − ID²) × density, with diameters in metres. For carbon steel that is roughly 0.02466 × t × (OD − t) kg/m with dimensions in mm.
Why is my shell heavier than calculated?
Add weld metal, nozzles, stiffeners and plate over-tolerance; fabricators often add 5–10% for this.
Need it designed and built?
SEMCO designs, fabricates and commissions evaporators, ZLD plants, heat exchangers, reactors and vacuum systems in its own factories in Pune and Solapur.
Related tools
Pressure vessel thickness (ASME VIII-1)
Shell and head thickness under internal pressure, corrosion allowance, plate selection and MAWP.
Tank and vessel volume
Total and partly filled volume of vertical or horizontal tanks with dished or conical heads, with a strapping table.
Process engineering unit converter
Pressure and vacuum (gauge and absolute), flow, energy, heat transfer coefficient, viscosity and more.