Evaporation & ZLD · Free tool
ZLD plant sizing and running cost estimator
Estimate a zero liquid discharge plant from two numbers: effluent flow and TDS. See how much water RO recovers, the evaporator and dryer loads, the salt you will have to handle, steam and power, and the running cost per KL.
1. Effluent
2. Treatment train
Reverse osmosis before evaporation?
Often 60–85%
Often 25–40%
3. Costs
Secured landfill (TSDF) charges; 0 if the salt is reused.
Running cost
₹279per KL
₹27,907 per day
Water recovered
99%
99 m³/day back for reuse
Salt to handle
0.85t/day
Flow through the plant
Effluent in
4.55 m³/h at 8,000 mg/L TDS (36.4 kg/h of dissolved salts)
Reverse osmosis
3.41 m³/h permeate (≈240 mg/L) back to use; 1.14 m³/h reject at ≈31,280 mg/L to the evaporator
4-effect evaporator (MEE)
Evaporates 1,009 kg/h; 127 kg/h of concentrate at 28% to the dryer. Steam ≈ 297 kg/h
Agitated thin film dryer (ATFD)
Evaporates 88 kg/h; 38.6 kg/h of dry salt out. Steam ≈ 110 kg/h
| Steam, total | 407 kg/h (9.0 t/day) |
|---|---|
| Power, total | 29.7 kW (RO 11.4 kW) |
| Steam cost | ₹19,712/day |
| Power cost | ₹5,220/day |
| Salt disposal | ₹2,975/day |
| Total running cost | ₹27,907/day ≈ ₹92.09 lakh/year at 330 days |
Want these numbers checked?
Send them to a SEMCO process engineer for a free review, sizing and budget price.
How this calculator works
A typical Indian ZLD plant has three stages after pretreatment: reverse osmosis recovers most of the water, a multi-effect evaporator (MEE) concentrates the RO reject, and an agitated thin film dryer (ATFD) turns the concentrate into dry salt. The calculator follows the dissolved salts through each stage.
RO splits the flow by your recovery percentage. A small share of salt passes into the permeate, set by the salt rejection, and the rest goes to the reject. The MEE evaporates water until the concentrate reaches your outlet concentration. The ATFD then evaporates the remaining water, leaving salt with the moisture you specify.
Steam for the MEE uses a steam economy of 0.85 per effect; the ATFD evaporates about 0.8 kg of water per kg of steam. Power covers RO (about 2.5 kWh per m³ of feed, or 4.5 for high-TDS feed), and about 3 kWh per tonne evaporated for pumps, vacuum and cooling tower, plus the dryer drive.
Formulas used
RO reject concentration
Evaporation in the MEE
Dry salt from the ATFD
Steam
Assumptions and limits
- TDS in mg/L is treated as ppm by weight and solution density as about 1 kg/L. At high concentrations this slightly overstates evaporation, which is on the safe side.
- All dissolved solids end up as salt. Organics that burn or volatilise, and suspended solids removed in pretreatment, are not separated out.
- Pretreatment (equalisation, clarification, softening, biological treatment) is assumed to be in place and is not costed.
- Chemicals, membrane replacement, labour and maintenance are not included.
- Evaporator condensate is counted as recovered water; in practice it may need polishing before reuse.
Worked example
100 KLD of effluent at 8,000 mg/L TDS, RO at 75 percent recovery, 4-effect MEE to 28 percent solids, 22 hours a day.
- Feed = 100 ÷ 22 ≈ 4.55 m³/h carrying about 36 kg/h of salts.
- RO gives about 3.41 m³/h of permeate and 1.14 m³/h of reject at roughly 31,000 mg/L.
- The MEE concentrates 1,136 kg/h of reject from about 3.1 percent to 28 percent, evaporating about 1,010 kg/h with about 300 kg/h of steam.
- The ATFD dries 127 kg/h of concentrate to about 39 kg/h of salt with 8 percent moisture, evaporating about 88 kg/h with about 110 kg/h of steam.
- About 99 percent of the water is recovered and about 0.85 tonnes of salt is produced each day.
Frequently asked questions
What does a ZLD plant cost to run per KL?
It varies widely with TDS, the share of water RO can recover, and steam cost. For moderate-TDS effluents with RO, running costs are often a few hundred rupees per KL; for high-TDS effluents evaporated directly, they can be much higher. Use the calculator with your own figures.
Why use RO before the evaporator?
RO removes water using electricity at a fraction of the cost of evaporating it. Every cubic metre RO recovers is a cubic metre the evaporator does not have to boil, which cuts the size and steam use of the thermal plant.
When should RO be skipped?
When TDS is already too high for RO (above about 40,000 mg/L), when the effluent has high organics, silica or scaling salts that foul membranes, or for small flows where a single evaporator is simpler.
What happens to the salt from a ZLD plant?
Mixed salts are usually sent to a secured landfill (TSDF). Some plants recover sodium sulphate or sodium chloride pure enough to reuse, which needs extra separation steps.
Is MVR better than MEE for ZLD?
MVR has a lower running cost for large, steady flows with low boiling point rise, while MEE suits high-TDS brines and plants with cheap steam. Many plants combine them. Compare them in the evaporator cost calculator.
Need it designed and built?
SEMCO designs, fabricates and commissions evaporators, ZLD plants, heat exchangers, reactors and vacuum systems in its own factories in Pune and Solapur.
Related tools
Evaporator energy and cost comparison
Single effect, multi-effect, TVR and MVR side by side: steam, power, annual cost and payback.
Saturated steam table calculator
Temperature, pressure, enthalpy, latent heat and specific volume of saturated steam, in bar(g), bar(a), kg/cm² or psi.
Vapour-liquid separator sizing
Souders-Brown sizing of knockout drums and evaporator vapour separators: diameter, height and velocity check.
Results are engineering estimates for early sizing and budgeting. Final designs depend on your liquid, site and codes, and are confirmed in SEMCO's proposal. Method reviewed by Jogender Dhayal, Director, SEMCO.